On arrival to this project there were a number of cracks in the screed. To overcome this, we ground out all the cracks and filled with epoxy and kiln dried sand. This binding the 2 screeds together.
We then applied an epoxy base with 160g mesh for strength.
At all door openings amd the mat well, we installed our aluminium trim beads. This gi e a detailed edge to trowel to.